BCC was the prime contractor for the project and self-performed the majority of the work. The project schedule and all quality requirements were met with no liquidated damages being assessed… Their proven track record speaks for itself.

Sourcing Agent
Southern Company Services

Plant Wansley Gypsum Disposal Facility

Southern Company, Plant Wansley

Franklin, Georgia

Long Term Gypsum Disposal Facility

Scope of Work:

Brad Cole Construction was the General Contractor for this project.  This gypsum disposal facility is one of the largest RCRA Subtitle D landfills in the Southeast.  Once completed, the three HDPE lined storage cells covered over 90 acres. 

Details:

  • 250 acres of clearing and grubbing
  •  2,800,000 cubic yards of excavation
  • Erosion and sediment control installation and maintenance
  • Placed 335,000 cubic yards of permeable clay liner and 370,000 tons of sand liner
  • Installed 18,949,000 square feet of geosynthetic liner
  • Installed 21,000 LF of fusion welded HDPE pipe ranging from 4” to 30”
  • Installed 28,000 linear feet of leachate trench and 50,000 linear feet of leachate piping
  • Provided culvert construction and miscellaneous concrete work