Select Page

Brad Cole Construction is very professional and have a good grasp of the scope of work and what they are doing. We call it Division II Complete. They do the complete scope of Division II. They are a good team player.

Vice President, Southeast District
Manager
Hensel-Phelps
U.S. Army 7th Special Forces
Complex

STOVL: Simulated Carrier Practice Landing Deck

Eglin Air Force Base, Florida

Scope of Work:
Airfield site package including, but limited to: clearing and grubbing, mass grading approximately 360,000 cubic yards, fine grading taxi ways, roadways and other paved or concrete areas, small storm package, small water service system and small sewer forcemain system, erosion control, seeding and sod.

Details:

  • 206 acre site
  • 360,000 CY