These projects have been predominantly turn-key on all site work, including clearing, erosion control, earthwork, design-build retaining walls, storm drain systems, underground detention systems, water systems, sanitary sewer systems, curb and gutter, and asphalt paving. BCC has met every expectation and requirement with regards to safety, quality and schedule.

Construction Project Supervisor
Douglas County School System

Manchester High School

Douglas County Schools

Scope of Work:

Brad Cole Construction was General Site Contractor for Douglas County’s newest high school.  

Details:

  • 49 acres clearing and grubbing
  • 514,700 cubic yards of excavation
  • Installed 29,100 square feet of retaining wall system
  • Installed 14,426 linear feet of storm drain system
  • Installed 18,184 linear feet of curb and gutter
  • installed 79,801 square yards of asphalt paving
  • Installed 7,000 linear feet water distribution line